This project involved the replacement existing 1000kVA transformer running cooling system of UWA’s Main Crawley Campus. The existing transformer was not only end of life, but was also installed in a location that was not compliant with current regulations and was exposed to corrosive Biocides. Datatel were required to specify and procure a new transformer, and complete electrical engineering for the new installation.

  • Client: University of WA
  • Status: Completed
  • Value: $250,000
  • Duration: 3 Months
  • Capabilites: Commercial
  • Market: Education

Datatel is responsible for the following items:

  • Selection and procurement of new transformer to suit existing installation conditions
  • Completing of HV, LV and Earthing engineering
  • Pit and Pipe network from Substation to new transformer
  • New HV and LV Consumers mains
  • Civil works